Client

Yanfeng Home Office Lot

Work Performed

Mill/Removal of Existing Asphalt Full Depth

  • Fine Grade Lot/Drive after Milling
  • Pave Lot 3” and 4” Depth
  • Stripe Lot
  • Perform while Site is still operational
  • Place signage in the lot
  • Time: 7 days
  • Size: 250,000 sf