Client

Kenowa Hills Public Schools

Work Performed

Fine Grade Asphalt Parking Areas

  • Pave Parking Areas at 3.5-inches with spec material
  • Maintain Timeline for cure and lot usage
  • Stripe Lot After Paving
  • Maintain for no Waterholes
  • Time: 8 days
  • Size: 131,000 sf